PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the Monumental Stairs Facing South.jpg Laying out block at Corridor 148 Facing South (2).jpg Laying out block at Corridor 148 Facing South.jpg 2nd floor Exterior metal framing Facing West.jpg Installing the Monumental Stairs Facing East.jpg
Previous pageNext page Laying out block at Corridor 148 Facing South (2)
Laying out block at Corridor 148 Facing South (2)